Facts ~
About 65 % of freight and 80%
passenger traffic is carried by the
roads.
#¤#
National Highways constitute only
about 2 % of the road network but
carry about 40 % of the total road
traffic .
#¤#
Number of vehicles has been
growing at an average pace of
10.16 % per annum over the last five
years.
10 Things to Remember when doing Concrete Mix Design
Good quality concrete starts with the quality of materials, cost effective designs is actually a by-product of selecting the best quality material and good construction practices. Following are 10 Things to remember during Concrete Mix Design and Concrete Trials.
Technical knowledge is an advantage for batching plant staff, even if you have good concrete design but uncommon or wrong procedures are practiced it will eventually result to failures.
What is the problem of over vibration of fresh concrete ?
What is the function of prime coat in bituminous pavement?
The principal function of prime coat in
bituminous pavement is to protect the
subgrade from moisture and
weathering. Since the presence of
moisture affects the strength of
subgrade, the prevention of water
entry
during construction is essential to
avoid the failure of the pavement. In
cold countries, by getting rid of
moisture from subgrade, the danger
of frost heave can be minimized .
Prime coat is an asphalt which, when
applied evenly to the surface of sub-
base or subgrade, serves to seal the
surface to hinder the penetration of
moisture into subgrade. Vehicular
traffic should be avoided on the
surface sprayed with prime coat
because the traction and tearing
action of vehicles would damage this
asphalt layer .
Facts About Construction In India
# Sardar Sarovar Dam being executed by the group is the third largest in the world for volume of chilled concrete to be placed - nearly 7 million cum
# Indira Sagar a 1000 MW Power
house is the second largest surface
power house in the country.
# Nathpa Jhakri a 1500 MW Power
House is the largest underground
power house in India .
# Tehri Dam is the third tallest rockfill dam in the world, and the largest in Asia invloving placement of over 25 million cum of all types of fill material.
# Baglihar Hydroelectric project
involved construction of 30km of
project road along with three bridges.
# Brahmaputra Guide Bund
completed in a record time of 7
months.
# Baspa-II and Chamera -II projects
involved continuous concrete
shuttering for tunnel lining which is
used for the first time in the country.
# Teesta V project has been provided with Jet Grouting curtain is being provided below the coffer dams for the first time in India.
# Alimineti Madhva Reddy Irrigation project is the longest underground face to face tunnel in the world.